Wych Elm – Garden

Posted On 19/11/2014
The next stage of work at Wych Elm is in the garden.  We are installing two retaining walls, one to retain a steep slope leading down to the swimming pool and another to retain a patio on the East terrace. 1  23  54  1011  1213  14 The house we are working on has quite a large garden, but a lot of it is unusable due to the steep slopes.  The steep slopes cause problems with access down to the bottom garden, getting the materials to the area of work is tricky. 6  78  9 We are also installing reinforced pad foundations for the decking support posts.  The decking will surround the swimming pool and pond, we will be installing the decking frame later on in the year. 15  1817  16